Ecosulis
Call us at Ecosulis on Telephone: 01225 874 040 Call us at Ecosulis on Telephone: 01225 874 040
Posted by: Hannah Maben - BSc (Hons) MIEEM on 07/12/2010

Ecosulis attended the above seminar on 3 December 2010, which is the first of many proposed by the University of Exeter’s ‘Big Dilemmas’ project. There was a strong opinion from some panelists and members of the audience that as well as promoting and supporting renewable energy schemes to increase the percentage of renewables in the energy mix, it is critical that action is taken now to reduce carbon emissions/energy consumption within the home, workplace and from the products and materials we use.

[More...]
Categories: Ecological Contracting
Tags: biodiversity | Energy Sector | Environmental Impact Assessment | Exeter University | Global Warming | Renewables

0 Comments »
Posted by: Rod Ellison on 25/11/2010

Ecosulis EIA has sucessful grown and diversified project work load during the last six months. They are currently very excited to be involved in supporting the development of local PV arrays.

[More...]
Categories: Ecological Contracting
Tags: CCGTs | Due diligence | Solar PV

0 Comments »
Posted by: Rod Ellison on 25/11/2010

Ecosulis EIA and Planning team has assisted Capita Symonds/Wales and West Utilities in obtaining consent from the Department of Energy and Climate Change (DECC) for a pipeline diversion in Fishguard, Wales. From being appointed Ecosulis obtained the determination from DECC in only eight weeks.

[More...]
Categories: Ecological Contracting
Tags: Determination | Pipeline | Public Gas Transporter

0 Comments »
Posted by: Roderick Ellison - MSc BSc (Hons) AIEMA on 26/08/2010

This year Ecosulis Ltd is pleased to announce that it has significantly strengthened the depth and quality of the service it offers to on and off shore wind farm developers.

[More...]
Categories: Ecological Contracting
Tags: ecosulis | Wind Farms

0 Comments »
Posted by: Roderick Ellison - MSc BSc (Hons) AIEMA on 25/08/2010

Government Response to the Consultation on the Grandfathering Policy of Support for Dedicated Biomass, Anaerobic Digestion and Energy from Waste Under the Renewables Obligation

[More...]
Categories: Ecological Contracting
Tags:

0 Comments »
Posted by: Roderick Ellison - MSc BSc (Hons) AIEMA on 25/08/2010

Statutory Consultation on the Renewables Obligation Order 2011 (ROO 2011) & Consultation on changes to Renewable Energy Guarantees of Origin (REGOs) Two part consultation, with the first section.

[More...]
Categories: Ecological Contracting
Tags: Renewables

0 Comments »
Posted by: Roderick Ellison - MSc BSc (Hons) AIEMA on 25/08/2010

The Government has published its Annual Energy Statement. The main document sets out 32 actions split into four key areas. More information can be provided upon request but of note:

[More...]
Categories: Ecological Contracting
Tags:

0 Comments »
Taylor Wimpey, Welsh Power, Morgan Cole, DPDS Consulting, Wates Developments, WSP, Gamesa